Worklog for task "Implement the blog"
Result
The blog implementation task is complete.
Actual Progress and Costs
The implementation took at least 5 hours longer than expected.
The main reason is the limitations of lovable.dev: you cannot simply transfer any existing project there without adaptation. To use Lovable for refining the visual part and then reuse the result in the main project, a significant portion of our own components had to be manually transferred there.
This entailed additional technical work:
- transferring components from the current project to the Lovable environment;
- installing missing dependencies;
- environment adaptation;
- fixing a large number of typing errors;
- bringing the transferred components to a state where they can be properly refined and then returned to the main project.
Conclusion
This extra work was costly in terms of time, but it creates a useful infrastructure for the future.
Now, visual components will be easier to refine via lovable.dev and then reuse in the main project. In other words, a significant portion of the extra costs went towards one-time environment and component preparation, which should reduce the cost of subsequent visual refinements.
Task: Implement the blog
Implement the blog as a separate presentation of existing concepts via the type system, without introducing a new technical entity.