Changing the Launch Scenario

Ongoing parallel operation of the Ruby and haih-cms versions is not required. The launch plan now involves a one-time switch to the new system after data migration and testing.

The old site will be kept as a backup and reference source; rollback is needed only as a short-term technical safety net in case of a critical issue at the time of launch.

05.09.2026

Prepare a one-time switch to the new website; continuous parallel operation of the Ruby and haih-cms versions is not required.